EIRAMANEIRAMAN ITEN
Part 11 of 13

Documentation

Every document for the business owner opens with what is wrong.

The business owner reads a few pages written for a manager. Operational documentation is produced and checked by the agents.

From management: Management reporting → One-page reporting

How it works

Documentation has three levels. What is meant for the business owner is short, in business language, and opens with the bad news: agents run on language models, which tend to please whoever is asking and to play down what went wrong. For auditors and customers a separate evidence pack is provided.

StrategicApproval: Vision, Principles, mandate
ManagerialReading and decision: one page per decision
OperationalAgents only: architecture, logs, tests
Evidence pack for third parties

Bad news first

Failed tests, open risks, dissent: up front.

One page per decision

What changed, what is asked, by when.

Every claim has evidence

The reviewer checks the link.

An omission blocks the document

Like a failed test blocks the work.

See also: Frameworks rethought

What it requires

  • 1–6Business language; four questions up front; changes first; one page; outcomes, not procedures; every claim with evidence.
  • 7An agent with the Product Owner's profile tries to understand the document before delivery.
  • 8–12Minimum set per level; bad news first; completeness check; evidence pack for third parties; qualified templates.
Full normative text · §8

8. Documentation

LevelAudienceContentVerified by
StrategicHuman Manager, who approvesVision, Principles, success criteria, mandateHuman Manager
ManagerialHuman Manager, who reads and decides by exceptionProject sheet, milestone plan, high-level architectural view, decision sheets, business risks, dashboard, cycle review, UAT outcome, cost report, security and performance summariesAI reviewer
OperationalAgentsArchitecture, backlog, Work Packages and Staff Planning, Log Tracker, detailed registers, test evidenceAI system

Writing rules for the Human Manager.

  1. Business language.
  2. Open with the four questions: what has changed, what is being asked, by when, what happens if there is no answer.
  3. Changes since the last reading come first.
  4. Length limits: one page per decision sheet.
  5. Outcomes, not procedures.
  6. Every verifiable statement is linked to evidence, and the AI reviewer checks the link.
  7. Comprehension test by an agent with the Human Manager profile, calibrated once by the Human Manager on about 5 documents.
  8. Minimum set per level, as listed in the requirements in §10.
  9. Bad news first: failed tests, open risks, dissent, rejections, missing decisions.
  10. Completeness check: an omission compared with the operational registers blocks delivery of the document.
  11. Third-party evidence pack: on request, for a single release; at level 2 it is ready at every release. It contains mandate, class and level, profiles and versions, checks and outcomes, independent verifications, accepted risks and acceptance.
  12. Qualified templates: each document type has a versioned template qualified by the maintainers.

Release.

  • Installation and user manual at every level; Executive Description and Performance Analysis where the level requires them. They are verified at every release.
  • The Performance Analysis compares the product's performance with expectations.
  • The cost report shows development costs and running costs of the application separately.
  • Progress expressed as a percentage states its denominator.

Governance artefacts.

  • High Level Plan: the high-level plan of activities, presented to the Human Manager as milestones.
  • High Level Architectural View: one page, with a drawing, showing the Human Manager what the product is made of, in terms understandable to non-specialists:

    • the points of contact with people, for example a web page, an app or an email;
    • where the data lives, for example a database, a document store or a spreadsheet, and which data classes it holds;
    • the external services and AI engines used, distinguishing those local to the organisation from external ones;
    • the main flows between the parts and the boundaries, that is what leaves the organisation and who can access it.

    It does not report operating systems, languages, versions, libraries or configurations: those details stay in the operational architecture document (§6 bis), from which the view is derived. The AI Coordinator updates it when a part is created, changes or disappears. A change that adds an external service or moves data outside the organisation is a Do.

  • Risk Log: the risks of project failure and how they are managed according to Risk Management. Business risks reach the Human Manager; the detail stays operational.
  • Executive Description: a short description of the product and its functions, to present it to non-specialists. The AI Coordinator keeps it updated and verified.
  • Product Backlog: contains the workstreams the teams can carry out, labelled and ordered according to the composable architecture (§6 bis).
  • Work Packages and Staff Planning: define the packages and the competences, i.e. the AI roles, down to the composition of the teams (§4 bis).
  • Performance Analysis: reports the product's most significant performance figures, for example the time to produce a document. It is estimated during design and updated with the tests.
  • Log Tracker: not designed to be read by people. It is the general log of all activities, used by the AI Coordinator to follow the teams' progress.
  • Progress dashboard: an HTML page updated by the AI Coordinator, with the percentage of progress of each phase, stating its denominator. It also contains a tree of the Work Packages (completed, in progress with their percentage, to do) with the cost estimate of each; for each package the Human Manager sees description, deliverables and team composition by Role Profile. A linked page gathers the project's strategic and managerial documents.

Shape of the control artefacts. In Scrum terms, every project and every Human Manager decide the shape of the artefacts they use for control. The dashboards, views and documents described here are a starting point: the Human Manager adapts them within the application's development and control cycle, and the choice is recorded as a project decision. The minimum content required by the drafting rules and by the level (§10) stays fixed.

Measurement. For each governance cycle, reading minutes, decisions, clarification questions and intercepted omissions are recorded.

Reference in the specification §8