EIRAMANEIRAMAN ITEN
Part 4 of 13

Phases of the production cycle

Agents carry out every phase; the planned decisions remain with a person.

The agent team carries out every phase. The business owner intervenes at the decision points set for each phase.

From management: Project life cycle

How it works

Each phase is made of short work cycles with the same rules: decisions, quality control, closure on evidence, costs recorded.

DiscoveryBusiness owner: Approves the Vision
POCBusiness owner: Intervenes only if the outcome is negative
Design and planningBusiness owner: Approves Principles and budget
ScaleBusiness owner: One review a week
Acceptance and operationBusiness owner: Accepts the result
The Pearl of Love

In a story by H. G. Wells, a prince devotes his life to building a mausoleum for the woman he loved. Year after year he enlarges and refines it, until the sarcophagus seems out of place in the composition and he orders: “Take that thing away.” Eiraman protects the Vision so that the work does not consume its own purpose: changing it means opening a new project.

H. G. Wells, “The Pearl of Love” · Wikisource

See also: Discovery with Design Thinking · Composable architecture · Quality · Frameworks rethought

What it requires

  • VThe Vision becomes binding with the mandate; changing it means opening a new project.
  • PPrinciples are frozen at the end of planning; a change during installation marks the version as failed.
  • SThe mandate contains stopping criteria: spend, cycles without results, a negative POC.
Full normative text · §5

Governing the scope

  • The Vision becomes binding when the mandate is approved. Changing it opens a new project.
  • Principles are frozen per version at the end of planning. If a Principle changes during installation, the AI Coordinator marks the version as failed, records the installed state and manages restore or transition to a new version.
  • The success criteria of a version and of the project are based on KPIs measurable in the test procedures.
  • Decisions may not violate a Principle. They are linked: changing one Decision may require changing the linked ones, which are then re-examined.
  • Each Decision has an identifier, owner, status, rationale, linked Principles and dependencies. A new Decision refers to the one it replaces and to the packages to be re-examined. A saving that changes a Decision goes to the Human Manager even when it is within the quality tolerance.
  • Each open point states which Wave it blocks and the criterion for closing it.
  • The mandate contains the project's stop criteria: spending, number of Waves without an accepted increment, a negative POC.

Production cycle

All five phases are executed by the AI system, organised in Waves, under the same rules: 3D escalation, competitive mechanisms, evidence-based closure, cost recording. The Human Manager steps in only at the decision points of each phase.

PhaseWho works (AI system)What it producesTypical competitive mechanismsHuman Manager decision
1. DiscoveryAI Coordinator, analyst and several exploring agents on different models, within guardrailsProblem, benefit, discarded alternatives, draft Vision; class assigned by the applicability gate (§10)Divergence: several agents generate hypotheses independently. Convergence: the analyst selects and ties back to user evidenceApproves Vision, mandate and class; may relaunch an exploration round
2. POCAI Coordinator, analyst, architect, executors, testerExplicit uncertainty, repeatable feasibility test, resources and access neededAlternative tests on the same technical question, when the selector is measurable (K1)Do only if the outcome is negative or requires new access or spending
3. Design and planningAnalyst, application architect, infrastructure architect, AI Scrum Master, AI CoordinatorBusiness, application, data and technology views; contracts, backlog, Work Packages, profiles, cost estimate, test criteria; proposed Principles and DecisionsAlternative architectures assessed against a rubric fixed in advanceApproves Principles, Decisions with business impact and budget; Principles are frozen
4. ScaleAI Coordinator, AI Squads with AI Scrum Master, testers and reviewersSoftware increments closed on evidenceK1–K9 on generative packagesGovernance cycle: periodic review and Do
5. Acceptance and operationAI Coordinator, testers, operations rolesAcceptance testing, release, manuals, service managementAlternative diagnoses of an incidentAcceptance of the result (UAT) and Do on operations

The project may refer to the TOGAF® standard in phase 3, under the conditions applicable to its user. Capacity and budget set the degree of parallelism in every phase.

In operation, from level 2, SLOs, incident management and blameless postmortems apply, and feed the retrospective (§10). When the error budget is exhausted, the environment applies a Deny to non-corrective releases.

Reference in the specification §5